Reactor primary circuit components inspected by INTERCONTROLE
RPV internals
- RPV Head
- RPV Bolting
- Bottom Mounted Instrumentation (BMI)
- Rod Control Cluster Assemblies
- Guide tube pins
- Baffle-to-former bolts
- In-Core thimbles
- EPR Control Rod Drive Mechanism (CRDM)
Rod Control Cluster Assemblies (RCCA) inspection
Primary Circuit piping
- Pressurizer Surge line
- Chemical and Volumetric Control system
- Boron injection Circuit
- EPR welds of the MCL
Chemical and volumetric Control system (CVCS) inspection
More than 70 inspections per year around the world
METHODS
- Eddy currents Testing (ET)
- Ultrasonic Testing (UT)
- Penetrant Testing (PT)
- Visual Testing (VT)