Media Center

Reactor primary circuit components inspected by INTERCONTROLE

RPV internals

  • RPV Head
  • RPV Bolting
  • Bottom Mounted Instrumentation (BMI)
  • Rod Control Cluster Assemblies
  • Guide tube pins
  • Baffle-to-former bolts
  • In-Core thimbles
  • EPR Control Rod Drive Mechanism (CRDM)
Rod Control Cluster Assemblies (RCCA) inspection

Rod Control Cluster Assemblies (RCCA) inspection        

Primary Circuit piping

  • Pressurizer Surge line
  • Chemical and Volumetric Control system
  • Boron injection Circuit
  • EPR welds of the MCL
Chemical and volumetric Control system (CVCS) inspection

Chemical and volumetric Control system (CVCS) inspection

More than 70 inspections per year around the world

METHODS

  • Eddy currents Testing (ET)
  • Ultrasonic Testing (UT)
  • Penetrant Testing (PT)
  • Visual Testing (VT)
http://www.framatome.com/EN/home-57/index.html
Contact us
GEX-CONTACT Contact us
Non Destructive Testing (NDT)
Download our flyers and videos
GEX-DOCS Brochure Intercontrôle